Camdenton High School Band

In Camdenton, Missouri

Trailer: Customer Provided 51′ Kentucky

Exterior Color: Black

Graphics: Clubhouse-Printed & Installed

Interior Layout: Split Entry Traditional

2nd Floor Length: 28 feet

Ramp: Roll-a-ramps

Side Entry: #1 Electric Stairs

Shelving: 3x Standard Instrument Shelving & Custom Drum Wall Storage with Carrier Grid

Additional Features: Barn Door Railing & Gate, Color Guard Drawers

The Camdenton High School Band built their Clubhouse Trailer in 2024. This build is considered a Total Electric Split Entry Layout, with our most popular features. 

Climb the Electric retracting staircase into the nose of the trailer, where the customized drumline storage shelving resides. Above your head is a drum carrier grid for storing up to 24 carriers. A telescoping handrail is located on the right side of the stairs, mounted to the door. 

A 3-step staircase leads from the nose to the carpeted 2nd floor. 40′ of upstairs lighting, in addition to downstairs lighting and 7 exterior-facing flood lights provide safety for late-night loading. 

3 sections of 6′ instrument shelves take up the curbside of the trailer, with the street side (driver’s side) left open for sousaphones or other instrument storage. Looking forward into the nose is the customized drum wall. This shelving is carpeted with open-loop carpet, and slanted back towards the wall, eliminating the need for strapping instruments down, in most cases. 

The nose contains the Drum Wall, customized specifically for Camdenton’s battery quantities and dimensions. 

At the rear of the 2nd floor is a staircase to the 1st floor. The electric rear stairs hinge upwards to allow for unobstructed loading and unloading of the 1st floor. A removeable door safety bar crosses the doorway of the #3 curbside door.